Parrish, Manatee County, Florida · FPL · operated by Florida Power & Light Co · owned by Nextera Energy Inc
2023 · headline year
The 3rd-largest power plant in Florida by capacity — 2,951 MW, 100% natural gas by fuel energy in 2023, first unit online in 1976, newest in 2005.
Fuel spend$192M2023 · estimate
Capacity in service2,951MW7 units · gas
Net generation6.64TWh2023 · reported
CO₂ emitted2.42Mt2023 · reported to EPA · 232nd highest of 6,030 in the US
Rank in Florida#3of 310 · by capacity · #12 of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor26%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 45.8 TBtu · reported · $192M est.
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
7 of 7 shown · 2,951 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 1
863.3
Natural Gas
Natural Gas Steam Turbine
1976
Operating
Unit 2
863.3
Natural Gas
Natural Gas Steam Turbine
1977
Operating
Unit 3
471.8
Natural Gas
Natural Gas Fired Combined Cycle
2005
Operating
Unit A
188.2
Natural Gas
Natural Gas Fired Combined Cycle
2005
Operating
Unit B
188.2
Natural Gas
Natural Gas Fired Combined Cycle
2005
Operating
Unit C
188.2
Natural Gas
Natural Gas Fired Combined Cycle
2005
Operating
Unit D
188.2
Natural Gas
Natural Gas Fired Combined Cycle
2005
Operating
All 7 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 167 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by Nextera Energy Inc (100%) and operated by Florida Power & Light Co, filed as investor-owned utility.
Which grid does it sell into?
FPL (Florida Power & Light Company) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1988. The oldest operating unit is Unit 1 (1976); the newest are Unit 3, Unit A, Unit B, Unit C and 1 more (2005).
When is it due to retire?
No retirement date has been filed for any operating unit at Manatee. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $192M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
2.42 Mt in 2023, reported to the EPA — the 232nd highest of 6,030 US facilities that reported. Down from 3.85 Mt in 2011.