Fort Myers, Lee County, Florida · FPL · operated by Florida Power & Light Co · owned by Nextera Energy Inc

2023 · headline year

The 5th-largest power plant in Florida by capacity — 2,681 MW, 100% natural gas by fuel energy in 2023, first unit online in 1958, newest in 2016.

Reported fuel cost$317M2023 · reported deliveries
Capacity in service2,681MW14 units · gas + oil
Net generation9.81TWh2023 · reported
CO₂ emitted4.13Mt2023 · reported to EPA · 98th highest of 6,030 in the US
Rank in Florida#5of 310 · by capacity · #20 of 13,147 US
Reported suppliers22023 · 17 deliveries
Capacity factor42%2023

Location

Lee County · FPL · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 72.5 TBtu · reported

CO₂ emitted, Mt · 2011–2023

0246201120172023
Reported (through 2023)

Generating units

24 of 24 shown · 2,681 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit ST2436.1Natural GasNatural Gas Fired Combined Cycle1969Operating
Unit PFM3C229.5Natural GasNatural Gas Fired Combustion Turbine2016Operating
Unit PFM3D229.5Natural GasNatural Gas Fired Combustion Turbine2016Operating
Unit 2A188.2Natural GasNatural Gas Fired Combined Cycle2000Operating
Unit 2B188.2Natural GasNatural Gas Fired Combined Cycle2000Operating
Unit 2C188.2Natural GasNatural Gas Fired Combined Cycle2000Operating
Unit 2D188.2Natural GasNatural Gas Fired Combined Cycle2001Operating
Unit 2E188.2Natural GasNatural Gas Fired Combined Cycle2001Operating
Unit 2F188.2Natural GasNatural Gas Fired Combined Cycle2001Operating
Unit CT1188.2Natural GasNatural Gas Fired Combustion Turbine2003Operating
Unit CT2188.2Natural GasNatural Gas Fired Combustion Turbine2003Operating
Unit ST1156.2Natural GasNatural Gas Fired Combined Cycle1958Operating
Unit 962.0Distillate oilPetroleum Liquids1974Operating
Unit GT162.0Distillate oilPetroleum Liquids1974Operating
Unit 1162.0Distillate oilPetroleum Liquids1974Retired 2016
Unit 1262.0Distillate oilPetroleum Liquids1974Retired 2016
Unit 362.0Distillate oilPetroleum Liquids1974Retired 2016
Unit 462.0Distillate oilPetroleum Liquids1974Retired 2016
Unit 562.0Distillate oilPetroleum Liquids1974Retired 2016
Unit 662.0Distillate oilPetroleum Liquids1974Retired 2016
Unit 762.0Distillate oilPetroleum Liquids1974Retired 2016
Unit 862.0Distillate oilPetroleum Liquids1974Retired 2016
Unit G1062.0Distillate oilPetroleum Liquids1974Retired 2016
Unit GT262.0Distillate oilPetroleum Liquids1974Retired 2016

All 24 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate.

See the engineering record →

Who supplies the fuel

1 of 2 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Florida GasNatural gas72.6n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).

Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 193 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 2 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Nextera Energy Inc · 100%
Operating utility
Florida Power & Light Co
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001483
Balancing authority
FPL
NERC region
SERC
Gas pipeline
Florida Gas Transmission Company
EIA plant ID
612

Common questions

How big is Fort Myers?
2,681 MW across 14 generating units in service — 2,557 MW of natural gas and 124 MW of oil. A further 10 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Nextera Energy Inc (100%) and operated by Florida Power & Light Co, filed as investor-owned utility.
Which grid does it sell into?
FPL (Florida Power & Light Company) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1995. The oldest operating unit is Unit ST1 (1958); the newest are Unit PFM3C and Unit PFM3D (2016).
When is it due to retire?
No retirement date has been filed for any operating unit at Fort Myers. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas and oil & petroleum came from 2 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $317M in 2023.
How much CO₂ does it emit?
4.13 Mt in 2023, reported to the EPA — the 98th highest of 6,030 US facilities that reported. Up from 3.2 Mt in 2011.

Related pages

Florida energyAll facilities in the state→Manatee2,951 MW operating capacity→ Turkey Point2,861 MW operating capacity→ Lauderdale2,664 MW operating capacity→ Martin2,448 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming