Fuel spend$02023 · no purchased fuel
Capacity in service484MW2 units · storage + solar
Rank in Florida#38of 310 · by capacity · #731 of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.
See the engineering record →
How big is Manatee Solar Energy Center?
484 MW across 2 generating units in service — 409 MW of storage and 74.5 MW of solar.
Who owns and operates it?
Operated by Florida Power & Light Co, filed as investor-owned utility.
Which grid does it sell into?
FPL (Florida Power & Light Company) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2020. The oldest operating unit is Unit 1 (2016); the newest is Unit BMS (2021).
When is it due to retire?
No retirement date has been filed for any operating unit at Manatee Solar Energy Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Batteries (409 MW) and Solar Photovoltaic (74.5 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.