AMERICAN ENERGY ATLAS
Industrial + power·Florida

Crystal River Power Plant

Crystal River, Citrus County, Florida · FPC · operated by Duke Energy Florida, LLC · owned by Duke Energy Corp

2023 · headline year

The 2nd-largest facility in Florida by capacity — 3,449 MW, 67% natural gas by fuel energy in 2023, first unit online in 1982, newest in 2018.

Fuel spend$648M2023 · estimate
Capacity in service3,449MW8 units · gas + coal
Net generation16.1TWh2023 · reported
CO₂ emitted8.39Mt2023 · reported to EPA · 23rd highest of 6,030 in the US
Rank in Florida#2of 310 · by capacity · #8 of 13,147 US
Reported suppliers312023 · 84 deliveries
Capacity factor53%2023

Location

Citrus County · FPC · SERC

What it burns

2023 · reported

Share of reported fuel consumption

67% Natural gas · 83.8 TBtu · reported · $386M est.33% Coal · 41.7 TBtu · reported · $255M est.

Natural gas supplies 67% of the fuel energy it burned in 2023. Per unit of heat, coal costs Crystal River Power Plant an estimated 1.3× more than natural gas.

CO₂ emitted, Mt · 2011–2023

051015201120172023
Reported (through 2023)

Generating units

11 of 11 shown · 3,449 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 5739.2Bituminous coalConventional Steam Coal1984Operating
Unit ST4739.2Bituminous coalConventional Steam Coal1982Operating
Unit CC1ST364.7Natural GasNatural Gas Fired Combined Cycle2018Operating
Unit CC2ST364.7Natural GasNatural Gas Fired Combined Cycle2018Operating
Unit 1GTA310.3Natural GasNatural Gas Fired Combined Cycle2018Operating
Unit 1GTB310.3Natural GasNatural Gas Fired Combined Cycle2018Operating
Unit 2GTA310.3Natural GasNatural Gas Fired Combined Cycle2018Operating
Unit 2GTB310.3Natural GasNatural Gas Fired Combined Cycle2018Operating
Unit 3890.4NuclearNuclear1977Retired 2013
Unit 2523.8Bituminous coalConventional Steam Coal1969Retired 2018
Unit 1440.5Bituminous coalConventional Steam Coal1966Retired 2018

All 11 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

1 of 31 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Hartree Partners,lpNatural gas12.9n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).

Showing 1 of 31 suppliers. Subscribe to see all 31, every one of the 933 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 31 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Duke Energy Corp · 100%
Operating utility
Duke Energy Florida, LLC
Jointly held units
Duke Energy Florida, LLC 92% of 1 unit
Orlando Utilities Comm 2% of 1 unit
Seminole Electric Cooperative Inc 2% of 1 unit
Several Municipals and Coops 5% of 1 unit
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants, Waste
EPA facility ID
1001487
Balancing authority
FPC
NERC region
SERC
EIA plant ID
628

Common questions

How big is Crystal River Power Plant?
3,449 MW across 8 generating units in service — 1,971 MW of natural gas and 1,478 MW of coal. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Duke Energy Corp (100%) and operated by Duke Energy Florida, LLC, filed as investor-owned utility. 4 owner stakes are filed on jointly held units.
Which grid does it sell into?
FPC (Progress Energy Florida) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2003. The oldest operating unit is Unit ST4 (1982); the newest are Unit CC1ST, Unit CC2ST, Unit 1GTA, Unit 1GTB and 2 more (2018).
When is it due to retire?
No retirement date has been filed for any operating unit at Crystal River Power Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and coal. Coal delivered in 2023 came from 2 coal suppliers, from mines in Indiana and Kentucky — principally Oaktown Fuels Mine #1. Other fuels (natural gas) came from 29 suppliers in 2023.
How much does it spend on fuel?
An estimated $648M in 2023 — natural gas $386M, coal $255M and oil & petroleum $7.15M. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
8.39 Mt in 2023, reported to the EPA — the 23rd highest of 6,030 US facilities that reported. Down from 11.1 Mt in 2011.

Related pages

Florida energyAll facilities in the state→West County Energy Center4,263 MW operating capacity→ Manatee2,951 MW operating capacity→ Turkey Point2,861 MW operating capacity→ Fort Myers2,681 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming