Power·Texas

E. Porte Ct.

Cameron County, Texas · ERCOT · operated by Power Depot Group A, LLC

2023 · headline year
Fuel spend$122,7522023 · estimate
Capacity in service9.0MW15 units · oil
Net generation599MWh2023 · reported
Rank in Texas#717 (tied)of 941 · by capacity · #5,746 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor1%2023

Location

Cameron County · ERCOT · TRE

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 5,564 MMBtu · reported · $122,752 est.

Reported fuel consumption, MMBtu · 2022–23

02,0004,0006,00020222023
Reported (through 2023)

Generating units

15 of 15 shown · 9.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit EPC10.6Distillate oilPetroleum Liquids2013Operating
Unit EPC100.6Distillate oilPetroleum Liquids2013Operating
Unit EPC110.6Distillate oilPetroleum Liquids2013Operating
Unit EPC120.6Distillate oilPetroleum Liquids2013Operating
Unit EPC130.6Distillate oilPetroleum Liquids2013Operating
Unit EPC140.6Distillate oilPetroleum Liquids2013Operating
Unit EPC150.6Distillate oilPetroleum Liquids2013Operating
Unit EPC20.6Distillate oilPetroleum Liquids2013Operating
Unit EPC30.6Distillate oilPetroleum Liquids2013Operating
Unit EPC40.6Distillate oilPetroleum Liquids2013Operating
Unit EPC50.6Distillate oilPetroleum Liquids2013Operating
Unit EPC60.6Distillate oilPetroleum Liquids2013Operating
Unit EPC70.6Distillate oilPetroleum Liquids2013Operating
Unit EPC80.6Distillate oilPetroleum Liquids2013Operating
Unit EPC90.6Distillate oilPetroleum Liquids2013Operating

All 15 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Power Depot Group A, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
ERCOT
NERC region
Texas RE (TRE)
EIA plant ID
65539

Common questions

How big is E. Porte Ct.?
9.0 MW across 15 generating units in service.
Who owns and operates it?
Operated by Power Depot Group A, LLC, filed as independent power producer.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 2013. Every operating unit came online in 2013.
When is it due to retire?
No retirement date has been filed for any operating unit at E. Porte Ct. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.
How much does it spend on fuel?
An estimated $122,752 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Texas energyAll facilities in the state→Clara9.0 MW operating capacity→ Cutten9.0 MW operating capacity→ Frankel9.0 MW operating capacity→ Goldsmith9.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming