AMERICAN ENERGY ATLAS
Power·Virginia

VMEA Peaking Gen

Prince William County, Virginia · PJM · operated by City of Manassas - (VA)

2023 · headline year
Fuel spend$101,6232023 · estimate
Capacity in service6.4MW4 units · oil
Net generation331MWh2023 · reported
Rank in Virginia#155 (tied)of 230 · by capacity · #6,264 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor1%2023

Location

Prince William County · PJM · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 5,155 MMBtu · reported · $101,623 est.

Reported fuel consumption, MMBtu · 2011–2023

05,00010,00015,000201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 6.4 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit V11.6Distillate oilPetroleum Liquids1992Operating
Unit V111.6Distillate oilPetroleum Liquids1993Operating
Unit V121.6Distillate oilPetroleum Liquids1993Operating
Unit V21.6Distillate oilPetroleum Liquids1992Operating

All 4 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Manassas - (VA)
Jointly held units
City of Franklin - (VA) 14% of 4 units
City of Harrisonburg - (VA) 49% of 4 units
City of Manassas - (VA) 27% of 4 units
Town of Blackstone - (VA) 4% of 4 units
Town of Culpeper- (VA) 3% of 4 units
Town of Elkton 2% of 4 units
+ 1 more
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
PJM
NERC region
SERC
EIA plant ID
7441

Common questions

How big is VMEA Peaking Gen?
6.4 MW across 4 generating units in service.
Who owns and operates it?
Operated by City of Manassas - (VA), filed as municipally owned utility. 7 owner stakes are filed on jointly held units.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1993. The oldest operating units are Unit V1 and Unit V2 (1992); the newest are Unit V11 and Unit V12 (1993).
When is it due to retire?
No retirement date has been filed for any operating unit at VMEA Peaking Gen. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.
How much does it spend on fuel?
An estimated $101,623 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Virginia energyAll facilities in the state→Middle Peninsula Landfill6.4 MW operating capacity→ Richmond Energy6.4 MW operating capacity→ Virginia Tech6.3 MW operating capacity→ Godwin Drive Plant6.3 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming