AMERICAN ENERGY ATLAS
Industrial + power·Virginia

Middle Peninsula Landfill

Saluda, Gloucester County, Virginia · PJM · operated by WM Renewable Energy LLC · owned by Waste Management Inc

2023 · headline year
Fuel spend$17,3692023 · estimate
Capacity in service6.4MW8 units · biomass
Net generation50GWh2023 · reported
CO₂ emitted57,194t2023 · reported to EPA · 3,435th highest of 6,030 in the US
Rank in Virginia#155 (tied)of 230 · by capacity · #6,264 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor89%2023

Location

Gloucester County · PJM · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 559,677 MMBtu · reported

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

8 of 8 shown · 6.4 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN10.8Landfill gasLandfill Gas2009Operating
Unit GEN20.8Landfill gasLandfill Gas2009Operating
Unit GEN30.8Landfill gasLandfill Gas2009Operating
Unit GEN40.8Landfill gasLandfill Gas2009Operating
Unit GEN50.8Landfill gasLandfill Gas2009Operating
Unit GEN60.8Landfill gasLandfill Gas2009Operating
Unit GEN70.8Landfill gasLandfill Gas2009Operating
Unit GEN80.8Landfill gasLandfill Gas2009Operating

All 8 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Waste Management Inc · 100%
Operating utility
WM Renewable Energy LLC
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1007635
Balancing authority
PJM
NERC region
SERC
EIA plant ID
57018

Common questions

How big is Middle Peninsula Landfill?
6.4 MW across 8 generating units in service.
Who owns and operates it?
Owned by Waste Management Inc (100%) and operated by WM Renewable Energy LLC, filed as industrial.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2009. Every operating unit came online in 2009.
When is it due to retire?
No retirement date has been filed for any operating unit at Middle Peninsula Landfill. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.
How much does it spend on fuel?
An estimated $17,369 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
57,194 t in 2023, reported to the EPA — the 3,435th highest of 6,030 US facilities that reported. Down from 103,796 t in 2011.

Related pages

Virginia energyAll facilities in the state→Cushaw7.5 MW operating capacity→ Electric Avenue Facility6.9 MW operating capacity→ Richmond Energy6.4 MW operating capacity→ VMEA Peaking Gen6.4 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming