AMERICAN ENERGY ATLAS
Power·Virginia

Godwin Drive Plant

Prince William County, Virginia · PJM · operated by City of Manassas - (VA)

2023 · headline year
Fuel spend$148,0482023 · estimate
Capacity in service6.3MW4 units · oil
Net generation430MWh2023 · reported
Rank in Virginia#158 (tied)of 230 · by capacity · #6,297 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor1%2023

Location

Prince William County · PJM · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 7,510 MMBtu · reported · $148,048 est.

Reported fuel consumption, MMBtu · 2011–2023

03,0006,0009,000201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 6.3 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit C71.6Distillate oilPetroleum Liquids1990Operating
Unit C81.6Distillate oilPetroleum Liquids1990Operating
Unit C91.6Distillate oilPetroleum Liquids1992Operating
Unit C101.5Distillate oilPetroleum Liquids1992Operating

All 4 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Manassas - (VA)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
PJM
NERC region
SERC
EIA plant ID
7439

Common questions

How big is Godwin Drive Plant?
6.3 MW across 4 generating units in service.
Who owns and operates it?
Operated by City of Manassas - (VA), filed as municipally owned utility.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1991. The oldest operating units are Unit C7 and Unit C8 (1990); the newest are Unit C9 and Unit C10 (1992).
When is it due to retire?
No retirement date has been filed for any operating unit at Godwin Drive Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.
How much does it spend on fuel?
An estimated $148,048 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Virginia energyAll facilities in the state→VMEA Peaking Gen6.4 MW operating capacity→ Virginia Tech6.3 MW operating capacity→ Danville6.0 MW operating capacity→ Monterey Diesel Generation Facility6.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming