AMERICAN ENERGY ATLAS
Industrial + power·Virginia

Virginia Tech

Blacksburg, Montgomery County, Virginia · PJM · operated by Virginia Polytechnic Inst and State Unv · owned by Commonwealth of Virginia

2023 · headline year
Fuel spend$5.94M2023 · estimate
Capacity in service6.3MW1 unit · gas
Net generation8.87GWh2023 · reported
CO₂ emitted66,032t2023 · reported to EPA · 3,131st highest of 6,030 in the US
Rank in Virginia#158 (tied)of 230 · by capacity · #6,297 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor16%2023

Location

Montgomery County · PJM · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 1.03 TBtu · reported · $5.91M est.

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 6.3 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit WG016.3Natural GasNatural Gas Steam Turbine1976Operating

1 unit shown. Behind it, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Commonwealth of Virginia · 100%
Operating utility
Virginia Polytechnic Inst and State Unv
Entity type
State-Owned Utility
Regulatory status
Not Regulated
Industry sector
Other
EPA facility ID
1005660
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
56785

Common questions

How big is Virginia Tech?
6.3 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Commonwealth of Virginia (100%) and operated by Virginia Polytechnic Inst and State Unv, filed as state-owned utility.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1976.
When is it due to retire?
No retirement date has been filed for any operating unit at Virginia Tech. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $5.94M in 2023 — natural gas $5.91M and oil & petroleum $22,922. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
66,032 t in 2023, reported to the EPA — the 3,131st highest of 6,030 US facilities that reported. Down from 121,657 t in 2011.

Related pages

Virginia energyAll facilities in the state→Richmond Energy6.4 MW operating capacity→ VMEA Peaking Gen6.4 MW operating capacity→ Godwin Drive Plant6.3 MW operating capacity→ Danville6.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming