Tracy, San Joaquin County, California · CAISO · operated by MRP San Joaquin Energy LLC. · owned by Middle River Power LLC
2023 · headline year
Fuel spend$57.8M2023 · estimate
Capacity in service336MW3 units · gas
Net generation816GWh2023 · reported
CO₂ emitted384,414t2023 · reported to EPA · 1,087th highest of 6,030 in the US
Rank in California#59of 1,713 · by capacity · #920 of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor28%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 6.95 TBtu · reported · $57.8M est.
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
3 of 3 shown · 336 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit TCC1
167.3
Natural Gas
Natural Gas Fired Combined Cycle
2012
Operating
Unit TPP1
84.4
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
Unit TPP2
84.4
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 269 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by Middle River Power LLC (100%) and operated by MRP San Joaquin Energy LLC., filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2007. The oldest operating units are Unit TPP1 and Unit TPP2 (2003); the newest is Unit TCC1 (2012).
When is it due to retire?
No retirement date has been filed for any operating unit at Tracy Combined Cycle Power Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $57.8M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
384,414 t in 2023, reported to the EPA — the 1,087th highest of 6,030 US facilities that reported. Up from 10,110 t in 2011.