AMERICAN ENERGY ATLAS
Power·California

Golden Field Solar III, LLC

Kern County, California · CAISO · operated by Golden Fields Solar III, LLC

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service339MW2 units · solar + storage · incl. 147 MW online after 2023
Rank in California#58of 1,713 · by capacity · #918 of 13,147 US

Location

Kern County · CAISO · WECC

Generating units

2 of 2 shown · 339 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit RCTR192.0SolarSolar Photovoltaic2020Operating
Unit RCBA147.0StorageBatteries2024Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.

See the engineering record →

Ownership & operations

Operating utility
Golden Fields Solar III, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
63859

Common questions

How big is Golden Field Solar III, LLC?
339 MW across 2 generating units in service — 192 MW of solar and 147 MW of storage.
Who owns and operates it?
Operated by Golden Fields Solar III, LLC, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2022. The oldest operating unit is Unit RCTR (2020); the newest is Unit RCBA (2024).
When is it due to retire?
No retirement date has been filed for any operating unit at Golden Field Solar III, LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (192 MW) and Batteries (147 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

California energyAll facilities in the state→Crimson350 MW operating capacity→ Scarlet II Hybrid350 MW operating capacity→ Tracy Combined Cycle Power Plant336 MW operating capacity→ Blythe Mesa Solar II336 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming