Fuel spend$02023 · no purchased fuel
Capacity in service336MW2 units · solar + storage
Rank in California#60of 1,713 · by capacity · #923 of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.
See the engineering record →
How big is Blythe Mesa Solar II?
336 MW across 2 generating units in service — 224 MW of solar and 112 MW of storage.
Who owns and operates it?
Operated by Blythe Mesa Solar II, LLC, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2022. Every operating unit came online in 2022.
When is it due to retire?
No retirement date has been filed for any operating unit at Blythe Mesa Solar II. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (224 MW) and Batteries (112 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.