AMERICAN ENERGY ATLAS
Industrial + power·Florida

Seminole (136)

Palatka, Putnam County, Florida · SEC · operated by Seminole Electric Cooperative Inc · owned by Seminole Electric Cooperative Inc

2023 · headline year

The 3rd-largest reported CO₂ emitter among facilities in Florida — 5.9 Mt in 2023, 52% coal by fuel energy in 2023, first unit online in 1984, newest in 2023.

Reported fuel cost$280M2023 · reported deliveries
Capacity in service1,898MW4 units · gas + coal
Net generation9.88TWh2023 · reported
CO₂ emitted5.9Mt2023 · reported to EPA · 50th highest of 6,030 in the US
Rank in Florida#13of 310 · by capacity · #82 of 13,147 US
Reported suppliers72023 · 117 deliveries

Location

Putnam County · SEC · SERC

What it burns

2023 · reported

Share of reported fuel consumption

52% Coal · 41.4 TBtu · reported48% Natural gas · 38 TBtu · reported

Coal supplies 52% of the fuel energy it burned in 2023.

CO₂ emitted, Mt · 2011–2023

0369201120172023
Reported (through 2023)

Generating units

6 of 6 shown · 1,898 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 2714.6Bituminous coalConventional Steam Coal1984Operating
Unit ST414.8Natural GasNatural Gas Fired Combined Cycle2023Operating
Unit CT1384.2Natural GasNatural Gas Fired Combined Cycle2023Operating
Unit CT2384.2Natural GasNatural Gas Fired Combined Cycle2023Operating
Unit 1714.6Bituminous coalConventional Steam Coal1984Retired 2024
Unit 3850.0Bituminous coalConventional Steam Coalnot reportedCanceled

All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

1 of 7 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Alliance CoalCoal30.41,270,571Cardinal, Kentucky + 2 moreRail

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 7 suppliers. Subscribe to see all 7, every one of the 753 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 7 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Seminole Electric Cooperative Inc · 100%
Operating utility
Seminole Electric Cooperative Inc
Entity type
Cooperative
Regulatory status
Regulated
Industry sector
Power Plants, Waste
EPA facility ID
1000084
Balancing authority
SEC
NERC region
SERC
Gas pipeline
Florida Gas Transmission Company
EIA plant ID
136

Common questions

How big is Seminole (136)?
1,898 MW across 4 generating units in service — 1,183 MW of natural gas and 715 MW of coal. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Seminole Electric Cooperative Inc (100%) and operated by Seminole Electric Cooperative Inc, filed as cooperative.
Which grid does it sell into?
SEC (Seminole Electric Cooperative) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2008. The oldest operating unit is Unit 2 (1984); the newest are Unit ST, Unit CT1 and Unit CT2 (2023).
When is it due to retire?
No retirement date has been filed for any operating unit at Seminole (136). An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned coal and natural gas. Coal delivered in 2023 came from 2 coal suppliers, from mines in Illinois and Kentucky — principally Cardinal. Other fuels (natural gas and oil & petroleum) came from 5 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $280M in 2023.
How much CO₂ does it emit?
5.9 Mt in 2023, reported to the EPA — the 50th highest of 6,030 US facilities that reported. Down from 7.96 Mt in 2011.

Related pages

Florida energyAll facilities in the state→St Lucie2,160 MW operating capacity→ Gulf Clean Energy Center2,108 MW operating capacity→ Big Bend1,829 MW operating capacity→ Okeechobee Clean Energy Center1,723 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming