AMERICAN ENERGY ATLAS
Power·Florida

Gulf Clean Energy Center

Pensacola, Escambia County, Florida · FPL · operated by Florida Power & Light Co · owned by Nextera Energy Inc

2023 · headline year
Reported fuel cost$113M2023 · reported deliveries
Capacity in service2,108MW8 units · gas
Net generation2.26TWh2023 · reported
CO₂ emitted1.51Mt2023 · reported to EPA · 413th highest of 6,030 in the US
Rank in Florida#12of 310 · by capacity · #64 of 13,147 US
Reported suppliers22023 · 13 deliveries
Capacity factor12%2023

Location

Escambia County · FPL · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 27.7 TBtu · reported

CO₂ emitted, Mt · 2011–2023

0246201120172023
Reported (through 2023)

Generating units

11 of 11 shown · 2,108 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 7578.0Natural GasNatural Gas Steam Turbine1973Operating
Unit 6369.7Natural GasNatural Gas Steam Turbine1970Operating
Unit 8A243.1Natural GasNatural Gas Fired Combustion Turbine2021Operating
Unit 8B243.1Natural GasNatural Gas Fired Combustion Turbine2021Operating
Unit 8C243.1Natural GasNatural Gas Fired Combustion Turbine2021Operating
Unit 8D243.1Natural GasNatural Gas Fired Combustion Turbine2021Operating
Unit 493.7Natural GasNatural Gas Steam Turbine1959Operating
Unit 593.7Natural GasNatural Gas Steam Turbine1961Operating
Unit 337.5Natural GasNatural Gas Steam Turbine1952Retired 2006
Unit 128.1Natural GasNatural Gas Steam Turbine1945Retired 2003
Unit 228.1Natural GasNatural Gas Steam Turbine1949Retired 2006

All 11 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

1 of 2 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Florida GasNatural gas27.7n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 366 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 2 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Nextera Energy Inc · 100%
Operating utility
Florida Power & Light Co
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1006702
Balancing authority
FPL
NERC region
SERC
Gas pipeline
Gulf South Pipeline Company LP
EIA plant ID
641

Common questions

How big is Gulf Clean Energy Center?
2,108 MW across 8 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Nextera Energy Inc (100%) and operated by Florida Power & Light Co, filed as investor-owned utility.
Which grid does it sell into?
FPL (Florida Power & Light Company) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1993. The oldest operating unit is Unit 4 (1959); the newest are Unit 8A, Unit 8B, Unit 8C and Unit 8D (2021).
When is it due to retire?
No retirement date has been filed for any operating unit at Gulf Clean Energy Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas and oil & petroleum came from 2 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $113M in 2023.
How much CO₂ does it emit?
1.51 Mt in 2023, reported to the EPA — the 413th highest of 6,030 US facilities that reported. Down from 4.62 Mt in 2011.

Related pages

Florida energyAll facilities in the state→Hines Energy Complex2,266 MW operating capacity→ St Lucie2,160 MW operating capacity→ Seminole (136)1,898 MW operating capacity→ Big Bend1,829 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming