AMERICAN ENERGY ATLAS
Power·Florida

Hines Energy Complex

Bartow, Polk County, Florida · FPC · operated by Duke Energy Florida, LLC · owned by Duke Energy Corp

2023 · headline year
Reported fuel cost$314M2023 · reported deliveries
Capacity in service2,266MW12 units · gas
Net generation11TWh2023 · reported
CO₂ emitted4.24Mt2023 · reported to EPA · 90th highest of 6,030 in the US
Rank in Florida#10of 310 · by capacity · #54 of 13,147 US
Reported suppliers162023 · 48 deliveries
Capacity factor55%2023

Location

Polk County · FPC · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 80.9 TBtu · reported

CO₂ emitted, Mt · 2011–2023

0246201120172023
Reported (through 2023)

Generating units

14 of 14 shown · 2,266 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 4ST212.5Natural GasNatural Gas Fired Combined Cycle2007Operating
Unit 3ST204.0Natural GasNatural Gas Fired Combined Cycle2005Operating
Unit 1ST199.7Natural GasNatural Gas Fired Combined Cycle1999Operating
Unit 4GT199.0Natural GasNatural Gas Fired Combined Cycle2007Operating
Unit 4GT2199.0Natural GasNatural Gas Fired Combined Cycle2007Operating
Unit 2ST191.3Natural GasNatural Gas Fired Combined Cycle2003Operating
Unit 2GT178.5Natural GasNatural Gas Fired Combined Cycle2003Operating
Unit 2GT2178.5Natural GasNatural Gas Fired Combined Cycle2003Operating
Unit 3GT178.5Natural GasNatural Gas Fired Combined Cycle2005Operating
Unit 3GT2178.5Natural GasNatural Gas Fired Combined Cycle2005Operating
Unit 1GT173.4Natural GasNatural Gas Fired Combined Cycle1999Operating
Unit 1GT2173.4Natural GasNatural Gas Fired Combined Cycle1999Operating
Unit 5517.0Natural GasNatural Gas Fired Combined Cyclenot reportedCanceled
Unit 6517.0Natural GasNatural Gas Fired Combined Cyclenot reportedCanceled

All 14 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate.

See the engineering record →

Who supplies the fuel

1 of 16 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Devon Gas ServicesNatural gas23.6n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 16 suppliers. Subscribe to see all 16, every one of the 636 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 16 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Duke Energy Corp · 100%
Operating utility
Duke Energy Florida, LLC
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001112
Balancing authority
FPC
NERC region
SERC
Gas pipeline
Florida Gas Transmission Company, Gulfstream Natural Gas System LLC
EIA plant ID
7302

Common questions

How big is Hines Energy Complex?
2,266 MW across 12 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Duke Energy Corp (100%) and operated by Duke Energy Florida, LLC, filed as investor-owned utility.
Which grid does it sell into?
FPC (Progress Energy Florida) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2004. The oldest operating units are Unit 1ST, Unit 1GT and Unit 1GT2 (1999); the newest are Unit 4ST, Unit 4GT and Unit 4GT2 (2007).
When is it due to retire?
No retirement date has been filed for any operating unit at Hines Energy Complex. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 16 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $314M in 2023.
How much CO₂ does it emit?
4.24 Mt in 2023, reported to the EPA — the 90th highest of 6,030 US facilities that reported. Down from 4.64 Mt in 2011.

Related pages

Florida energyAll facilities in the state→Sanford2,378 MW operating capacity→ Bayside Power Station2,294 MW operating capacity→ St Lucie2,160 MW operating capacity→ Gulf Clean Energy Center2,108 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming