Big Bend

Apollo Beach, Hillsborough, Florida · TEC · operated by Tampa Electric Co · owned by TECO Energy Inc

2023 · headline year
Fuel spend$174M2023 · estimate
Capacity in service1,829MW7 units · gas + solar + storage
Net generation4.81TWh2023 · reported
CO₂ emitted3Mt2023 · reported to EPA for the whole site, which is larger than the plant shown here · 161st highest of 6,030 in the US
Rank in Florida#14of 310 · by capacity · #93 of 13,147 US
Reported suppliers32023 · 21 deliveries
Capacity factor30%2023

Location

Hillsborough · TEC · SERC

CO₂ emitted, Mt · 2011–2023

051015201120172023
Reported (through 2023)

Generating units

12 of 12 shown · 1,829 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit ST4486.0Natural GasNatural Gas Steam Turbine1985Operating
Unit ST1445.5Natural GasNatural Gas Fired Combined Cycle1970Operating
Unit GT5397.8Natural GasNatural Gas Fired Combined Cycle2021Operating
Unit GT6397.8Natural GasNatural Gas Fired Combined Cycle2021Operating
Unit GT469.9Natural GasNatural Gas Fired Combustion Turbine2009Operating
Unit 119.8SolarSolar Photovoltaic2017Operating
Unit BESS112.6StorageBatteries2017Operating
Unit ST2445.5Bituminous coalConventional Steam Coal1973Retired 2021
Unit ST3445.5Natural GasNatural Gas Steam Turbine1976Retired 2023
Unit GT278.7Distillate oilPetroleum Liquids1974Retired 2008
Unit GT378.7Distillate oilPetroleum Liquids1974Retired 2008
Unit GT118.0Distillate oilPetroleum Liquids1969Retired 2008

All 12 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.

See the engineering record →
UnitEventWhenMW
Unit ST4derate2025-0462.0 MW
Unit ST4retirement2040-01486 MW

Who supplies the fuel

1 of 3 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Gulf StreamNatural gas27.4n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 3 suppliers. Subscribe to see all 3, every one of the 470 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 3 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
TECO Energy Inc · 100%
Operating utility
Tampa Electric Co
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001492
Balancing authority
TEC
NERC region
SERC
Gas pipeline
Florida Gas Transmission Company, Gulfstream Natural Gas System LLC
EIA plant ID
645

Common questions

How big is Big Bend?
1,829 MW across 7 generating units in service — 1,797 MW of natural gas, 19.8 MW of solar and 12.6 MW of storage. A further 5 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by TECO Energy Inc (100%) and operated by Tampa Electric Co, filed as investor-owned utility.
Which grid does it sell into?
TEC (Tampa Electric Company) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1998. The oldest operating unit is Unit ST1 (1970); the newest are Unit GT5 and Unit GT6 (2021).
When is it due to retire?
Planned retirement dates are filed for 1 of 7 operating units: Unit ST4 (2040).
What does it burn, and where does the fuel come from?
Its generating units are fuelled by natural gas, bituminous coal and distillate oil. Coal delivered in 2023 came from 2 coal suppliers, from mines in Illinois — principally Prairie Eagle - Underground. Other fuels (natural gas) came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $174M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
3 Mt in 2023, reported to the EPA — the 161st highest of 6,030 US facilities that reported. Down from 10.2 Mt in 2011.

Also at this site

Tampa Electric Co NA 3Nearby, same operator · canceled→ Big Bend Floating Solar ISame site · operating→ Big Bend AgrivoltaicsSame site · operating→

Related pages

Florida energyAll facilities in the state→Gulf Clean Energy Center2,108 MW operating capacity→ Seminole (136)1,898 MW operating capacity→ Okeechobee Clean Energy Center1,723 MW operating capacity→ Polk1,592 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming