Okeechobee, Okeechobee County, Florida · FPL · operated by Florida Power & Light Co · owned by Nextera Energy Inc
2023 · headline year
Fuel spend$310M2023 · estimate
Capacity in service1,723MW4 units · gas
Net generation11.4TWh2023 · reported
CO₂ emitted3.81Mt2023 · reported to EPA · 110th highest of 6,030 in the US
Rank in Florida#15of 310 · by capacity · #113 of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor75%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 71.9 TBtu · reported · $309M est.
CO₂ emitted, Mt · 2019–23
Reported (through 2023)
Generating units
4 of 4 shown · 1,723 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 1ST
593.3
Natural Gas
Natural Gas Fired Combined Cycle
2019
Operating
Unit 1A
376.6
Natural Gas
Natural Gas Fired Combined Cycle
2019
Operating
Unit 1B
376.6
Natural Gas
Natural Gas Fired Combined Cycle
2019
Operating
Unit 1C
376.6
Natural Gas
Natural Gas Fired Combined Cycle
2019
Operating
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 65 deliveries recorded 2019–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by Nextera Energy Inc (100%) and operated by Florida Power & Light Co, filed as investor-owned utility.
Which grid does it sell into?
FPL (Florida Power & Light Company) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2019. Every operating unit came online in 2019.
When is it due to retire?
No retirement date has been filed for any operating unit at Okeechobee Clean Energy Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $310M in 2023 — natural gas $309M and oil & petroleum $579,610. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
3.81 Mt in 2023, reported to the EPA — the 110th highest of 6,030 US facilities that reported. Up from 2.35 Mt in 2019.