P L Bartow Power Plant

Saint Petersburg, Pinellas County, Florida · FPC · operated by Duke Energy Florida, LLC · owned by Duke Energy Corp

2023 · headline year
Reported fuel cost$197M2023 · reported deliveries
Capacity in service1,476MW9 units · gas + oil
Net generation6.57TWh2023 · reported
CO₂ emitted2.7Mt2023 · reported to EPA · 201st highest of 6,030 in the US
Rank in Florida#17of 310 · by capacity · #148 of 13,147 US
Reported suppliers122023 · 37 deliveries
Capacity factor51%2023

Location

Pinellas County · FPC · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 51.2 TBtu · reported

CO₂ emitted, Mt · 2011–2023

0246201120172023
Reported (through 2023)

Generating units

12 of 12 shown · 1,476 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 4ST421.2Natural GasNatural Gas Fired Combined Cycle2009Operating
Unit 4AGT208.2Natural GasNatural Gas Fired Combined Cycle2009Operating
Unit 4BGT208.2Natural GasNatural Gas Fired Combined Cycle2009Operating
Unit 4CGT208.2Natural GasNatural Gas Fired Combined Cycle2009Operating
Unit 4DGT208.2Natural GasNatural Gas Fired Combined Cycle2009Operating
Unit P155.4Distillate oilPetroleum Liquids1972Operating
Unit P255.4Natural GasNatural Gas Fired Combustion Turbine1972Operating
Unit P355.4Distillate oilPetroleum Liquids1972Operating
Unit P455.4Natural GasNatural Gas Fired Combustion Turbine1972Operating
Unit ST3239.3Residual oilPetroleum Liquids1963Retired 2009
Unit ST1127.5Residual oilPetroleum Liquids1958Retired 2009
Unit ST2127.5Residual oilPetroleum Liquids1961Retired 2009

All 12 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

1 of 12 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Shell Energy North AmericaNatural gas26.6n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).

Showing 1 of 12 suppliers. Subscribe to see all 12, every one of the 363 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 12 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Duke Energy Corp · 100%
Operating utility
Duke Energy Florida, LLC
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001489
Balancing authority
FPC
NERC region
SERC
Gas pipeline
Florida Gas Transmission Company
EIA plant ID
634

Common questions

How big is P L Bartow Power Plant?
1,476 MW across 9 generating units in service — 1,365 MW of natural gas and 111 MW of oil. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Duke Energy Corp (100%) and operated by Duke Energy Florida, LLC, filed as investor-owned utility.
Which grid does it sell into?
FPC (Progress Energy Florida) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2003. The oldest operating units are Unit P1, Unit P2, Unit P3 and Unit P4 (1972); the newest are Unit 4ST, Unit 4AGT, Unit 4BGT, Unit 4CGT and 1 more (2009).
When is it due to retire?
No retirement date has been filed for any operating unit at P L Bartow Power Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas and oil & petroleum came from 12 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $197M in 2023.
How much CO₂ does it emit?
2.7 Mt in 2023, reported to the EPA — the 201st highest of 6,030 US facilities that reported. Down from 3.03 Mt in 2011.

Related pages

Florida energyAll facilities in the state→Okeechobee Clean Energy Center1,723 MW operating capacity→ Polk1,592 MW operating capacity→ Northside1,407 MW operating capacity→ Port Everglades1,352 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming