Northside

Jacksonville, Duval County, Florida · JEA · operated by JEA · owned by Jacksonville Electric Authority

2023 · headline year
Reported fuel cost$174M2023 · reported deliveries
Capacity in service1,407MW7 units · coal + gas + oil
Net generation3.19TWh2023 · reported
CO₂ emitted2.85Mt2023 · reported to EPA · 183rd highest of 6,030 in the US
Rank in Florida#18of 310 · by capacity · #163 of 13,147 US
Reported suppliers52023 · 37 deliveries
Capacity factor26%2023

Location

Duval County · JEA · SERC

What it burns

2023 · reported

Share of reported fuel consumption

61% Natural gas · 21.7 TBtu · reported31% Petroleum coke · 11 TBtu · reported7% Coal · 2.36 TBtu · reported1% Biomass · 0.5 TBtu · reported

Natural gas supplies 61% of the fuel energy it burned in 2023.

CO₂ emitted, Mt · 2011–2023

0246201120172023
Reported (through 2023)

Generating units

7 of 7 shown · 1,407 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit ST3563.7Natural GasNatural Gas Steam Turbine1977Operating
Unit 1297.5Bituminous coalConventional Steam Coal1966Operating
Unit 2297.5Bituminous coalConventional Steam Coal1972Operating
Unit 462.1Distillate oilPetroleum Liquids1975Operating
Unit 562.1Distillate oilPetroleum Liquids1974Operating
Unit 662.1Distillate oilPetroleum Liquids1974Operating
Unit GT362.1Distillate oilPetroleum Liquids1975Operating

All 7 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

1 of 5 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Peoples Natural GasNatural gas21.7n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).

Showing 1 of 5 suppliers. Subscribe to see all 5, every one of the 482 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 5 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Jacksonville Electric Authority · 100%
Operating utility
JEA
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001498
Balancing authority
JEA
NERC region
SERC
EIA plant ID
667

Common questions

How big is Northside?
1,407 MW across 7 generating units in service — 595 MW of coal, 564 MW of natural gas and 248 MW of oil.
Who owns and operates it?
Owned by Jacksonville Electric Authority (100%) and operated by JEA, filed as municipally owned utility.
Which grid does it sell into?
JEA is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1973. The oldest operating unit is Unit 1 (1966); the newest is Unit ST3 (1977).
When is it due to retire?
No retirement date has been filed for any operating unit at Northside. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas, petroleum coke, coal and biomass. Coal delivered in 2023 came from 1 coal supplier. Other fuels (natural gas, oil & petroleum and petroleum coke) came from 4 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $174M in 2023.
How much CO₂ does it emit?
2.85 Mt in 2023, reported to the EPA — the 183rd highest of 6,030 US facilities that reported. Down from 3.19 Mt in 2011.

Related pages

Florida energyAll facilities in the state→Polk1,592 MW operating capacity→ P L Bartow Power Plant1,476 MW operating capacity→ Port Everglades1,352 MW operating capacity→ Cape Canaveral1,295 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming