CO₂ emitted1.35Mt2023 · reported to EPA · 449th highest of 6,030 in the US
Rank in New Mexico#3of 153 · by capacity · #531 of 13,147 US
Reported suppliers22023 · 36 deliveries
Capacity factor63%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 26.5 TBtu · reported
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
3 of 3 shown · 650 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit STG1
300.0
Natural Gas
Natural Gas Fired Combined Cycle
2006
Operating
Unit CTG1
175.0
Natural Gas
Natural Gas Fired Combined Cycle
2006
Operating
Unit CTG2
175.0
Natural Gas
Natural Gas Fired Combined Cycle
2006
Operating
All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; ownership stakes where a unit is jointly held.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 464 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
PNM (Public Service Company of New Mexico) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2006. Every operating unit came online in 2006.
When is it due to retire?
No retirement date has been filed for any operating unit at Luna Energy Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 2 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $75.7M in 2023.
How much CO₂ does it emit?
1.35 Mt in 2023, reported to the EPA — the 449th highest of 6,030 US facilities that reported. Up from 738,507 t in 2011.