Fuel spend$02023 · no purchased fuel
Capacity in service450MW2 units · solar + storage · incl. 300 MW online after 2023
Rank in New Mexico#5of 153 · by capacity · #763 (tied) of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.
See the engineering record →
How big is Arroyo Solar Energy Storage Hybrid?
450 MW across 2 generating units in service — 300 MW of solar and 150 MW of storage.
Who owns and operates it?
Operated by Arroyo Solar LLC, filed as independent power producer.
Which grid does it sell into?
PNM (Public Service Company of New Mexico) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2024. The oldest operating unit is Unit ARESS (2023); the newest is Unit ARSOL (2024).
When is it due to retire?
No retirement date has been filed for any operating unit at Arroyo Solar Energy Storage Hybrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (300 MW) and Batteries (150 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.