Rio Grande

Sunland Park, Dona Ana County, New Mexico · EPE · operated by El Paso Electric Co · owned by El Paso Electric Co

2023 · headline year
Reported fuel cost$20.7M2023 · reported deliveries
Capacity in service398MW4 units · gas
Net generation895GWh2023 · reported
CO₂ emitted532,931t2023 · reported to EPA · 904th highest of 6,030 in the US
Rank in New Mexico#7of 153 · by capacity · #828 of 13,147 US
Reported suppliers102023 · 37 deliveries
Capacity factor26%2023

Location

Dona Ana County · EPE · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 10 TBtu · reported

CO₂ emitted, t · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 398 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 8166.5Natural GasNatural Gas Steam Turbine1972Operating
Unit 9131.8Natural GasNatural Gas Fired Combustion Turbine2013Operating
Unit 650.0Natural GasNatural Gas Steam Turbine1957Operating
Unit 750.0Natural GasNatural Gas Steam Turbine1958Operating

All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →
UnitEventWhenMW
Unit 6retirement2026-1250.0 MW
Unit 7retirement2027-1250.0 MW
Unit 8retirement2033-12166 MW

Who supplies the fuel

1 of 10 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Morgan StanleyNatural gas2.36n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 10 suppliers. Subscribe to see all 10, every one of the 356 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 10 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
El Paso Electric Co · 100%
Operating utility
El Paso Electric Co
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000752
Balancing authority
EPE
NERC region
WECC
EIA plant ID
2444

Common questions

How big is Rio Grande?
398 MW across 4 generating units in service.
Who owns and operates it?
Owned by El Paso Electric Co (100%) and operated by El Paso Electric Co, filed as investor-owned utility.
Which grid does it sell into?
EPE (El Paso Electric Company) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1982. The oldest operating unit is Unit 6 (1957); the newest is Unit 9 (2013).
When is it due to retire?
Planned retirement dates are filed for 3 of 4 operating units: Unit 6 (2026), Unit 7 (2027) and Unit 8 (2033).
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 10 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $20.7M in 2023.
How much CO₂ does it emit?
532,931 t in 2023, reported to the EPA — the 904th highest of 6,030 US facilities that reported. Up from 449,688 t in 2011.

Related pages

New Mexico energyAll facilities in the state→Arroyo Solar Energy Storage Hybrid450 MW operating capacity→ Cunningham444 MW operating capacity→ Red Cloud Wind LLC350 MW operating capacity→ Clines Corners Wind Farm LLC325 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming