Four Corners Steam Elec Station

Fruitland, San Juan County, New Mexico · AZPS · operated by Arizona Public Service Co · owned by Pinnacle West Capital Corp, PNM Resources Inc, Salt River Project Agricultural Improvement & Power District and 2 more

2023 · headline year

The largest power plant in New Mexico by capacity — 1,636 MW, 99% coal by fuel energy in 2023, first unit online in 1969.

Reported fuel cost$233M2023 · reported deliveries
Capacity in service1,636MW2 units · coal
Net generation7.43TWh2023 · reported
CO₂ emitted7.19Mt2023 · reported to EPA · 31st highest of 6,030 in the US
Rank in New Mexico#1of 153 · by capacity · #130 of 13,147 US
Reported suppliers22023 · 22 deliveries
Capacity factor52%2023

Location

San Juan County · AZPS · WECC

What it burns

2023 · reported

Share of reported fuel consumption

99% Coal · 73.8 TBtu · reported1% Natural gas · 0.635 TBtu · reported

Coal supplies 99% of the fuel energy it burned in 2023.

CO₂ emitted, Mt · 2011–2023

051015201120172023
Reported (through 2023)

Generating units

5 of 5 shown · 1,636 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 4818.1Bituminous coalConventional Steam Coal1969Operating
Unit 5818.1Bituminous coalConventional Steam Coal1970Operating
Unit 3253.4Bituminous coalConventional Steam Coal1964Retired 2013
Unit 1190.0Bituminous coalConventional Steam Coal1963Retired 2013
Unit 2190.0Bituminous coalConventional Steam Coal1963Retired 2013

All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; ownership stakes where a unit is jointly held.

See the engineering record →
UnitEventWhenMW
Unit 4retirement2031-12818 MW
Unit 5retirement2031-12818 MW

Who supplies the fuel

1 of 2 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
BHP Billiton MarketingCoal643,503,622not reportedTruck

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).

Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 310 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 2 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Arizona Public Service Co
Jointly held units
4C Acquisition, LLC 7% of 1 unit
Arizona Public Service Co 63% of 2 units
El Paso Electric Co 7% of 1 unit
Public Service Co of NM 13% of 2 units
Salt River Project 10% of 2 units
Tucson Electric Power Co 7% of 2 units
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1007245
Balancing authority
AZPS
NERC region
WECC
EIA plant ID
2442

Common questions

How big is Four Corners Steam Elec Station?
1,636 MW across 2 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Pinnacle West Capital Corp, PNM Resources Inc, Salt River Project Agricultural Improvement & Power District and 2 more and operated by Arizona Public Service Co, filed as investor-owned utility. 6 owner stakes are filed on jointly held units.
Which grid does it sell into?
AZPS (Arizona Public Service Company) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1970. The oldest operating unit is Unit 4 (1969); the newest is Unit 5 (1970).
When is it due to retire?
Planned retirement dates are filed for 2 of 2 operating units: Unit 4 (2031) and Unit 5 (2031).
What does it burn, and where does the fuel come from?
In 2023 it burned coal and natural gas. Coal delivered in 2023 came from 1 coal supplier. Other fuels (natural gas) came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $233M in 2023.
How much CO₂ does it emit?
7.19 Mt in 2023, reported to the EPA — the 31st highest of 6,030 US facilities that reported. Down from 13.2 Mt in 2011.

Related pages

New Mexico energyAll facilities in the state→Hobbs Generating Station682 MW operating capacity→ Luna Energy Facility650 MW operating capacity→ Sagamore Wind522 MW operating capacity→ Arroyo Solar Energy Storage Hybrid450 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming