Hobbs, Lea County, New Mexico · SPP · operated by Lea Power Partners LLC · owned by Lea Power Partners LLC
2023 · headline year
The 2nd-largest power plant in New Mexico by capacity — 682 MW, 100% natural gas by fuel energy in 2023, first unit online in 2008.
Fuel spend$75.8M2023 · estimate
Capacity in service682MW4 units · gas
Net generation3.93TWh2023 · reported
CO₂ emitted1.6Mt2023 · reported to EPA · 384th highest of 6,030 in the US
Rank in New Mexico#2of 153 · by capacity · #499 of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor66%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 29 TBtu · reported · $75.8M est.
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
4 of 4 shown · 682 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit ST3
280.5
Natural Gas
Natural Gas Fired Combined Cycle
2008
Operating
Unit GT1
196.9
Natural Gas
Natural Gas Fired Combined Cycle
2008
Operating
Unit GT2
196.9
Natural Gas
Natural Gas Fired Combined Cycle
2008
Operating
Unit CHW-T
7.2
Natural Gas
Natural Gas Fired Combustion Turbine
2008
Operating
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 156 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Transwestern Pipeline Company, Northern Natural Gas, El Paso Natural Gas Company LLC
EIA plant ID
56458
Common questions
How big is Hobbs Generating Station?
682 MW across 4 generating units in service.
Who owns and operates it?
Owned by Lea Power Partners LLC (100%) and operated by Lea Power Partners LLC, filed as independent power producer.
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2008. Every operating unit came online in 2008.
When is it due to retire?
No retirement date has been filed for any operating unit at Hobbs Generating Station. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $75.8M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
1.6 Mt in 2023, reported to the EPA — the 384th highest of 6,030 US facilities that reported. Up from 1.28 Mt in 2011.