Fuel spend$02023 · no purchased fuel
Capacity in service55.3MW2 units · solar
Rank in Arizona#73of 166 · by capacity · #3,338 of 13,147 US
How big is Kayenta Solar Project?
55.3 MW across 2 generating units in service.
Who owns and operates it?
Operated by NGI-Kayenta Solar Lessor I, LLC, filed as independent power producer.
Which grid does it sell into?
WALC (Western Area Power Administration - Desert Southwest Region) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2018. The oldest operating unit is Unit PV1 (2017); the newest is Unit PV2 (2019).
When is it due to retire?
No retirement date has been filed for any operating unit at Kayenta Solar Project. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (55.3 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.