Fuel spend$5.82M2023 · estimate
Capacity in service62.6MW2 units · gas
Net generation149GWh2023 · reported
CO₂ emitted81,103t2023 · reported to EPA · 2,758th highest of 6,030 in the US
Rank in Arizona#71of 166 · by capacity · #3,179 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor27%2023
All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.
See the engineering record →
How big is Yuma Cogeneration Associates?
62.6 MW across 2 generating units in service.
Who owns and operates it?
Which grid does it sell into?
AZPS (Arizona Public Service Company) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1994. Every operating unit came online in 1994.
When is it due to retire?
No retirement date has been filed for any operating unit at Yuma Cogeneration Associates. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $5.82M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
81,103 t in 2023, reported to the EPA — the 2,758th highest of 6,030 US facilities that reported. Up from 44,364 t in 2011.