Capacity in service62.5MW2 units · solar + storage · incl. 62.5 MW online after 2023
Rank in Arizona#72of 166 · by capacity · #3,181 (tied) of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.
See the engineering record →
How big is Mesquite Solar 4, LLC?
62.5 MW across 2 generating units in service — 52.5 MW of solar and 10.0 MW of storage.
Who owns and operates it?
Operated by Consolidated Edison Development Inc., filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2024. Every operating unit came online in 2024.
When is it due to retire?
No retirement date has been filed for any operating unit at Mesquite Solar 4, LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (52.5 MW) and Batteries (10.0 MW).