Fuel spend$02023 · no purchased fuel
Capacity in service190MW2 units · solar + storage
Rank in Nevada#27of 111 · by capacity · #1,573 (tied) of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.
See the engineering record →
How big is Yellow Pine Solar?
190 MW across 2 generating units in service — 125 MW of solar and 65.0 MW of storage.
Who owns and operates it?
Operated by Yellow Pine Solar, LLC, filed as independent power producer.
Which grid does it sell into?
NEVP (Nevada Power Company) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2023. Every operating unit came online in 2023.
When is it due to retire?
No retirement date has been filed for any operating unit at Yellow Pine Solar. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (125 MW) and Batteries (65.0 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.