Clark County, Nevada · NEVP · operated by Yellow Pine Solar II, LLC
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit YP2BP | 65.0 | Solar | Solar Photovoltaic | 2024 | Operating |
| Unit YP2AP | 60.0 | Solar | Solar Photovoltaic | 2024 | Operating |
| Unit YP2AB | 53.0 | Storage | Batteries | 2024 | Operating |
| Unit YP2BB | 32.0 | Storage | Batteries | 2024 | Operating |
All 4 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.
See the engineering record →