AMERICAN ENERGY ATLAS
Industrial + power·Florida

WestRock CP, LLC - Fernandina Beach Mill (Formerly Smurfit-Stone)

Fernandina Beach, Nassau County, Florida · JEA · operated by WestRock, Fernandina Beach · owned by Westrock Co

2023 · headline year
Fuel spend$47.6M2023 · estimate
Capacity in service96.9MW2 units · biomass
Net generation558GWh2023 · reported
CO₂ emitted380,268t2023 · reported to EPA · 1,097th highest of 6,030 in the US
Rank in Florida#68of 310 · by capacity · #2,539 of 13,147 US
Reported suppliers32023 · 27 deliveries
Capacity factor66%2023

Location

Nassau County · JEA · SERC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

69% Black liquor · 12.1 TBtu · reported25% Natural gas · 4.38 TBtu · reported · $37.2M est.5% Coal · 0.835 TBtu · reported · $6.21M est.1% Oil & petroleum · 0.171 TBtu · reported · $4.1M est.

Black liquor supplies 69% of the fuel energy its on-site power plant burned in 2023.

CO₂ emitted, t · 2011–2023

0300,000600,000900,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 96.9 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN659.5Black liquorWood/Wood Waste Biomass1982Operating
Unit GEN537.4Black liquorWood/Wood Waste Biomass1988Operating
Unit GEN49.3Bituminous coalConventional Steam Coal1963Retired 2003

All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

1 of 3 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
TECO EnergyNatural gas4.38n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 3 suppliers. Subscribe to see all 3, every one of the 361 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 3 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Westrock Co · 100%
Operating utility
WestRock, Fernandina Beach
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Pulp and Paper
EPA facility ID
1002272
Balancing authority
JEA
NERC region
SERC
EIA plant ID
10202

Common questions

How big is WestRock CP, LLC - Fernandina Beach Mill (Formerly Smurfit-Stone)?
96.9 MW across 2 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Westrock Co (100%) and operated by WestRock, Fernandina Beach, filed as industrial.
Which grid does it sell into?
JEA is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1984. The oldest operating unit is Unit GEN6 (1982); the newest is Unit GEN5 (1988).
When is it due to retire?
No retirement date has been filed for any operating unit at WestRock CP, LLC - Fernandina Beach Mill (Formerly Smurfit-Stone). An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned black liquor, natural gas, coal and oil & petroleum. Coal delivered in 2023 came from 1 coal supplier, from mines in Virginia — principally Lone Mountain Processing. Other fuels (natural gas and oil & petroleum) came from 2 suppliers in 2023.
How much does it spend on fuel?
An estimated $47.6M in 2023 — natural gas $37.2M, coal $6.21M and oil & petroleum $4.1M. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
380,268 t in 2023, reported to the EPA — the 1,097th highest of 6,030 US facilities that reported. Down from 617,589 t in 2011.

Related pages

Florida energyAll facilities in the state→Sunshine Gateway Solar Energy Center104 MW operating capacity→ Ascend Performance Materials LLC102 MW operating capacity→ Palm Beach Renewable Energy Facility 296.0 MW operating capacity→ Babcock Solar Energy Center Hybrid84.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming