Fuel spend$326,1692023 · estimate
Capacity in service96.0MW1 unit · waste
Net generation535GWh2023 · reported
Rank in Florida#69of 310 · by capacity · #2,545 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor64%2023
1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.
See the engineering record →
How big is Palm Beach Renewable Energy Facility 2?
96.0 MW across 1 generating unit in service.
Who owns and operates it?
Operated by Solid Waste Authority of Palm Beach Co, filed as political subdivision.
Which grid does it sell into?
FPL (Florida Power & Light Company) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2015.
When is it due to retire?
No retirement date has been filed for any operating unit at Palm Beach Renewable Energy Facility 2. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned other fuels and natural gas.
How much does it spend on fuel?
An estimated $326,169 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.