Palm Beach Renewable Energy Facility 2

Palm Beach County, Florida · FPL · operated by Solid Waste Authority of Palm Beach Co

2023 · headline year
Fuel spend$326,1692023 · estimate
Capacity in service96.0MW1 unit · waste
Net generation535GWh2023 · reported
Rank in Florida#69of 310 · by capacity · #2,545 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor64%2023

Location

Palm Beach County · FPL · SERC

What it burns

2023 · reported

Share of reported fuel consumption

99% Other fuels · 8.98 TBtu · reported1% Natural gas · 0.0815 TBtu · reported · $326,169 est.

Other fuels supplies 99% of the fuel energy it burned in 2023.

Reported fuel consumption, TBtu · 2015–23

051015201520192023
Reported (through 2023)

Generating units

1 of 1 shown · 96.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN296.0Municipal solid wasteMunicipal Solid Waste2015Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Solid Waste Authority of Palm Beach Co
Entity type
Political Subdivision
Regulatory status
Not Regulated
Balancing authority
FPL
NERC region
SERC
EIA plant ID
57898

Common questions

How big is Palm Beach Renewable Energy Facility 2?
96.0 MW across 1 generating unit in service.
Who owns and operates it?
Operated by Solid Waste Authority of Palm Beach Co, filed as political subdivision.
Which grid does it sell into?
FPL (Florida Power & Light Company) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2015.
When is it due to retire?
No retirement date has been filed for any operating unit at Palm Beach Renewable Energy Facility 2. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned other fuels and natural gas.
How much does it spend on fuel?
An estimated $326,169 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Florida energyAll facilities in the state→Ascend Performance Materials LLC102 MW operating capacity→ WestRock CP, LLC - Fernandina Beach Mill (Formerly Smurfit-Stone)96.9 MW operating capacity→ Babcock Solar Energy Center Hybrid84.5 MW operating capacity→ International Paper - Pensacola Mill82.8 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming