Fuel spend$02023 · no purchased fuel
Capacity in service84.5MW2 units · solar + storage
Rank in Florida#70of 310 · by capacity · #2,661 of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.
See the engineering record →
How big is Babcock Solar Energy Center Hybrid?
84.5 MW across 2 generating units in service — 74.5 MW of solar and 10.0 MW of storage.
Who owns and operates it?
Operated by Florida Power & Light Co, filed as investor-owned utility.
Which grid does it sell into?
FPL (Florida Power & Light Company) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2016. The oldest operating unit is Unit 1 (2016); the newest is Unit BA (2018).
When is it due to retire?
No retirement date has been filed for any operating unit at Babcock Solar Energy Center Hybrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (74.5 MW) and Batteries (10.0 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.