Power·California
Verizon-Torrance
Los Angeles County, California · LDWP · operated by Bloom Energy
Retired 20232023 · headline year
Retired — its last generating unit went out of service in 2023, ending 1.0 MW of capacity, 100% natural gas by fuel energy in 2023.
Fuel spend$347,2782023 · estimate
Retired capacity1.0MW1 unit · none in service
Reported suppliersNot reported2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 41,717 MMBtu · reported · $347,278 est.
Reported fuel consumption, MMBtu · 2014–23
Reported (through 2023)
Generating units
1 of 1 shown · none in service
Who supplies the fuel
2023
No fuel deliveries are reported for 2023.
Ownership & operations
- Operating utility
- Bloom Energy
- Entity type
- Commercial
- Regulatory status
- Not Regulated
- Balancing authority
- LDWP
- NERC region
- WECC
- EIA plant ID
- 59261
Common questions
How big is Verizon-Torrance?
1.0 MW across 1 unit, none of which is in service — all retired.
Who owns and operates it?
Operated by Bloom Energy, filed as commercial.
Which grid does it sell into?
LDWP (Los Angeles Department of Water and Power) is its balancing authority, inside NERC's WECC region.
When is it due to retire?
It has already retired — the last unit retired in 2023.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $347,278 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
Related pages
Select a state