Power·California
Verizon Comms Garage Top Solar Project
Santa Clara County, California · CAISO · operated by Verizon Communications
Capacity shown is planned or not in service
Proposed
A planned 2.3 MW solar photovoltaic project, filed to come online in 2025.
Planned capacity2.3MW1 unit · not yet in service
Location
Generating units
1 of 1 shown · none in service
1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →
Ownership & operations
- Operating utility
- Verizon Communications
- Entity type
- Independent Power Producer
- Regulatory status
- Not Regulated
- Balancing authority
- CAISO
- NERC region
- WECC
- EIA plant ID
- 65507
Common questions
How big is Verizon Comms Garage Top Solar Project?
2.3 MW across 1 unit, none of which is in service — all planned.
Who owns and operates it?
Operated by Verizon Communications, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
What does it run on?
Solar Photovoltaic (2.3 MW).
Related pages
Select a state