Union County Resource Recovery Facility

Rahway, Union County, New Jersey · PJM · operated by Reworld Union (NJ), LLC · owned by Covanta Holding Corp

2023 · headline year
Fuel spend$2.55M2023 · estimate
Capacity in service45.0MW1 unit · waste
Net generation298GWh2023 · reported
CO₂ emitted238,157t2023 · reported to EPA · 1,406th highest of 6,030 in the US
Rank in New Jersey#27of 407 · by capacity · #3,649 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor76%2023

Location

Union County · PJM · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Other fuels · 5.45 TBtu · reported

CO₂ emitted, t · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 45.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN145.0Municipal solid wasteMunicipal Solid Waste1994Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Covanta Holding Corp · 100%
Operating utility
Reworld Union (NJ), LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1002269
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
50960

Common questions

How big is Union County Resource Recovery Facility?
45.0 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Covanta Holding Corp (100%) and operated by Reworld Union (NJ), LLC, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1994.
When is it due to retire?
No retirement date has been filed for any operating unit at Union County Resource Recovery Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned other fuels.
How much does it spend on fuel?
An estimated $2.55M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
238,157 t in 2023, reported to the EPA — the 1,406th highest of 6,030 US facilities that reported. Up from 201,040 t in 2011.

Related pages

New Jersey energyAll facilities in the state→Howard M Down68.2 MW operating capacity→ Paulsboro Refining Company LLC60.5 MW operating capacity→ Camden Cnty Resource Recovery Assoc35.0 MW operating capacity→ Princeton University Cogeneration32.1 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming