Fuel spend$1.29M2023 · estimate
Capacity in service35.0MW2 units · waste
Net generation173GWh2023 · reported
CO₂ emitted145,410t2023 · reported to EPA · 1,875th highest of 6,030 in the US
Rank in New Jersey#28of 407 · by capacity · #3,899 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor56%2023
All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; stack height.
See the engineering record →
How big is Camden Cnty Resource Recovery Assoc?
35.0 MW across 2 generating units in service.
Who owns and operates it?
Owned by
Covanta Holding Corp (100%) and operated by Covanta Camden Energy Recovery Center, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1991. Every operating unit came online in 1991.
When is it due to retire?
No retirement date has been filed for any operating unit at Camden Cnty Resource Recovery Assoc. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned other fuels.
How much does it spend on fuel?
An estimated $1.29M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
145,410 t in 2023, reported to the EPA — the 1,875th highest of 6,030 US facilities that reported. Up from 98,869 t in 2011.