AMERICAN ENERGY ATLAS
Power·New Jersey

Howard M Down

Vineland, Cumberland County, New Jersey · PJM · operated by City of Vineland - (NJ) · owned by City of Vineland New Jersey

2023 · headline year
Fuel spend$2.16M2023 · estimate
Capacity in service68.2MW1 unit · gas
Net generation68.7GWh2023 · reported
CO₂ emitted37,792t2023 · reported to EPA · 4,263rd highest of 6,030 in the US
Rank in New Jersey#25of 407 · by capacity · #3,110 of 13,147 US
Reported suppliersNot reported2023
Capacity factor12%2023

Location

Cumberland County · PJM · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 704,313 MMBtu · reported · $2.16M est.

CO₂ emitted, t · 2011–2023

030,00060,00090,000201120172023
Reported (through 2023)

Generating units

7 of 7 shown · 68.2 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 1168.2Natural GasNatural Gas Fired Combustion Turbine2012Operating
Unit 1025.0Residual oilPetroleum Liquids1970Retired 2012
Unit 916.5Residual oilPetroleum Liquids1960Retired 2010
Unit 812.5Residual oilPetroleum Liquids1955Retired 2009
Unit 77.5Residual oilPetroleum Liquids1952Retired 2008
Unit 65.0Residual oilPetroleum Liquids1949Retired 2008
Unit 54.0Residual oilPetroleum Liquids1942Retired 2008

All 7 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
City of Vineland New Jersey · 100%
Operating utility
City of Vineland - (NJ)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000751
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
2434

Common questions

How big is Howard M Down?
68.2 MW across 1 generating unit in service. A further 6 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by City of Vineland New Jersey (100%) and operated by City of Vineland - (NJ), filed as municipally owned utility.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2012.
When is it due to retire?
No retirement date has been filed for any operating unit at Howard M Down. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $2.16M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
37,792 t in 2023, reported to the EPA — the 4,263rd highest of 6,030 US facilities that reported. Up from 3,576 t in 2011.

Related pages

New Jersey energyAll facilities in the state→Clayville73.0 MW operating capacity→ Essex County Resource Recovery Facility69.8 MW operating capacity→ Paulsboro Refining Company LLC60.5 MW operating capacity→ Union County Resource Recovery Facility45.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming