AMERICAN ENERGY ATLAS
Industrial + power·New Jersey

Essex County Resource Recovery Facility

Newark, Essex County, New Jersey · PJM · operated by Covanta Essex Company · owned by Covanta Holding Corp

2023 · headline year
Fuel spend$2.14M2023 · estimate
Capacity in service69.8MW2 units · waste
Net generation438GWh2023 · reported
CO₂ emitted402,308t2023 · reported to EPA · 1,055th highest of 6,030 in the US
Rank in New Jersey#24of 407 · by capacity · #3,093 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor72%2023

Location

Essex County · PJM · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Other fuels · 9.52 TBtu · reported

CO₂ emitted, t · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 69.8 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN134.9Municipal solid wasteMunicipal Solid Waste1990Operating
Unit GEN234.9Municipal solid wasteMunicipal Solid Waste1990Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Covanta Holding Corp · 100%
Operating utility
Covanta Essex Company
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1004216
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
10643

Common questions

How big is Essex County Resource Recovery Facility?
69.8 MW across 2 generating units in service.
Who owns and operates it?
Owned by Covanta Holding Corp (100%) and operated by Covanta Essex Company, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1990. Every operating unit came online in 1990.
When is it due to retire?
No retirement date has been filed for any operating unit at Essex County Resource Recovery Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned other fuels.
How much does it spend on fuel?
An estimated $2.14M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
402,308 t in 2023, reported to the EPA — the 1,055th highest of 6,030 US facilities that reported. Down from 412,825 t in 2011.

Related pages

New Jersey energyAll facilities in the state→Forked River Power LLC76.8 MW operating capacity→ Clayville73.0 MW operating capacity→ Howard M Down68.2 MW operating capacity→ Paulsboro Refining Company LLC60.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming