Fuel spend$02023 · no purchased fuel
Capacity in service270MW2 units · solar + storage
Rank in Nevada#16of 111 · by capacity · #1,114 (tied) of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.
See the engineering record →
How big is Townsite Solar Project Hybrid?
270 MW across 2 generating units in service — 180 MW of solar and 90.0 MW of storage.
Who owns and operates it?
Operated by Townsite Solar, LLC, filed as independent power producer.
Which grid does it sell into?
WALC (Western Area Power Administration - Desert Southwest Region) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2021. Every operating unit came online in 2021.
When is it due to retire?
No retirement date has been filed for any operating unit at Townsite Solar Project Hybrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (180 MW) and Batteries (90.0 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.