Orlando, Orange County, Florida · FPC · operated by Stanton Clean Energy LLC · owned by Nextera Energy Inc
2023 · headline year
Fuel spend$102M2023 · estimate
Capacity in service688MW3 units · gas
Net generation3.55TWh2023 · reported
CO₂ emitted1.33Mt2023 · reported to EPA · 455th highest of 6,030 in the US
Rank in Florida#31of 310 · by capacity · #493 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2023
Capacity factor59%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 25.5 TBtu · reported · $102M est.
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
5 of 5 shown · 688 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit C
281.9
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
Unit A
203.2
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
Unit B
203.2
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
Unit BCT
197.0
Coal syngas
Coal Integrated Gasification Combined Cycle
not reported
Canceled
Unit BST
132.0
Coal syngas
Coal Integrated Gasification Combined Cycle
not reported
Canceled
All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; ownership stakes where a unit is jointly held.
Florida Municipal Power Agency 4% of 3 units Kissimmee Utility Authority 4% of 3 units Orlando Utilities Comm 28% of 3 units Stanton Clean Energy LLC 65% of 3 units
688 MW across 3 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Nextera Energy Inc and operated by Stanton Clean Energy LLC, filed as independent power producer. 4 owner stakes are filed on jointly held units.
Which grid does it sell into?
FPC (Progress Energy Florida) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2003. Every operating unit came online in 2003.
When is it due to retire?
No retirement date has been filed for any operating unit at Stanton A. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $102M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
1.33 Mt in 2023, reported to the EPA — the 455th highest of 6,030 US facilities that reported. Up from 712,686 t in 2011.