AMERICAN ENERGY ATLAS
Power·Florida

Arvah B Hopkins

Tallahassee, Leon County, Florida · TAL · operated by City of Tallahassee - (FL) · owned by City of Tallahassee Florida

2023 · headline year
Reported fuel cost$46.6M2023 · reported deliveries
Capacity in service673MW9 units · gas
Net generation1.65TWh2023 · reported
CO₂ emitted703,691t2023 · reported to EPA · 780th highest of 6,030 in the US
Rank in Florida#32of 310 · by capacity · #509 of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor28%2023

Location

Leon County · TAL · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 13.1 TBtu · reported

CO₂ emitted, t · 2011–2023

0300,000600,000900,000201120172023
Reported (through 2023)

Generating units

15 of 15 shown · 673 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 2259.2Natural GasNatural Gas Fired Combined Cycle1977Operating
Unit CT 2A198.9Natural GasNatural Gas Fired Combined Cycle2008Operating
Unit GT360.5Natural GasNatural Gas Fired Combustion Turbine2005Operating
Unit GT460.5Natural GasNatural Gas Fired Combustion Turbine2005Operating
Unit IC118.8Natural GasNatural Gas Internal Combustion Engine2019Operating
Unit IC218.8Natural GasNatural Gas Internal Combustion Engine2019Operating
Unit IC318.8Natural GasNatural Gas Internal Combustion Engine2019Operating
Unit IC418.8Natural GasNatural Gas Internal Combustion Engine2019Operating
Unit IC518.8Natural GasNatural Gas Internal Combustion Engine2020Operating
Unit 175.0Natural GasNatural Gas Steam Turbine1971Retired 2018
Unit GT227.0Natural GasNatural Gas Fired Combustion Turbine1972Retired 2017
Unit GT116.3Natural GasNatural Gas Fired Combustion Turbine1970Retired 2017
Unit 5212.5Natural GasNatural Gas Fired Combined Cyclenot reportedCanceled
Unit GT560.0Natural GasNatural Gas Fired Combustion Turbinenot reportedCanceled
Unit CT A50.0Natural GasNatural Gas Fired Combined Cyclenot reportedCanceled

All 15 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

1 of 1 supplier · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
FGTNatural gas13n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

The supplier is shown. Subscribe to see every one of the 156 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
City of Tallahassee Florida · 100%
Operating utility
City of Tallahassee - (FL)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1007189
Balancing authority
TAL
NERC region
SERC
Gas pipeline
Florida Gas Transmission Company
EIA plant ID
688

Common questions

How big is Arvah B Hopkins?
673 MW across 9 generating units in service. A further 6 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by City of Tallahassee Florida (100%) and operated by City of Tallahassee - (FL), filed as municipally owned utility.
Which grid does it sell into?
TAL (City of Tallahassee) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1997. The oldest operating unit is Unit 2 (1977); the newest is Unit IC5 (2020).
When is it due to retire?
No retirement date has been filed for any operating unit at Arvah B Hopkins. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $46.6M in 2023.
How much CO₂ does it emit?
703,691 t in 2023, reported to the EPA — the 780th highest of 6,030 US facilities that reported. Up from 623,939 t in 2011.

Related pages

Florida energyAll facilities in the state→Cane Island706 MW operating capacity→ Stanton A688 MW operating capacity→ Lansing Smith Generating Plant662 MW operating capacity→ Osprey Energy Center644 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming