Intercession City, Osceola County, Florida · FMPP · operated by Kissimmee Utility Authority · owned by Florida Municipal Power Agency

2023 · headline year
Reported fuel cost$91.5M2023 · reported deliveries
Capacity in service706MW7 units · gas
Net generation4.19TWh2023 · reported
CO₂ emitted1.63Mt2023 · reported to EPA · 378th highest of 6,030 in the US
Rank in Florida#30of 310 · by capacity · #474 of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor68%2023

Location

Osceola County · FMPP · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 30.5 TBtu · reported

CO₂ emitted, Mt · 2011–2023

0123201120172023
Reported (through 2023)

Generating units

7 of 7 shown · 706 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 4180.0Natural GasNatural Gas Fired Combined Cycle2011Operating
Unit 3152.0Natural GasNatural Gas Fired Combined Cycle2002Operating
Unit 4A143.5Natural GasNatural Gas Fired Combined Cycle2011Operating
Unit 3A82.5Natural GasNatural Gas Fired Combined Cycle2002Operating
Unit 276.0Natural GasNatural Gas Fired Combined Cycle1995Operating
Unit 2A40.0Natural GasNatural Gas Fired Combined Cycle1995Operating
Unit 132.0Natural GasNatural Gas Fired Combustion Turbine1994Operating

All 7 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

1 of 1 supplier · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
FguNatural gas30.1n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

The supplier is shown. Subscribe to see every one of the 155 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Kissimmee Utility Authority
Jointly held units
Florida Municipal Power Agency 50% of 5 units
Kissimmee Utility Authority 50% of 5 units
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001098
Balancing authority
FMPP
NERC region
SERC
Gas pipeline
Florida Gas Transmission Company, Gulfstream Natural Gas System LLC
EIA plant ID
7238

Common questions

How big is Cane Island?
706 MW across 7 generating units in service.
Who owns and operates it?
Owned by Florida Municipal Power Agency and operated by Kissimmee Utility Authority, filed as municipally owned utility. 2 owner stakes are filed on jointly held units.
Which grid does it sell into?
FMPP (Florida Municipal Power Pool) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2005. The oldest operating unit is Unit 1 (1994); the newest are Unit 4 and Unit 4A (2011).
When is it due to retire?
No retirement date has been filed for any operating unit at Cane Island. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $91.5M in 2023.
How much CO₂ does it emit?
1.63 Mt in 2023, reported to the EPA — the 378th highest of 6,030 US facilities that reported. Up from 854,878 t in 2011.

Related pages

Florida energyAll facilities in the state→DeBary Power Plant748 MW operating capacity→ Vandolah Power Project728 MW operating capacity→ Stanton A688 MW operating capacity→ Arvah B Hopkins673 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming