SRI International Cogeneration Project

Menlo Park, San Mateo County, California · CAISO · operated by IPT SRI Cogeneration Inc · owned by Sri International

2023 · headline year
Fuel spend$3.83M2023 · estimate
Capacity in service6.0MW1 unit · gas
Net generation27.3GWh2023 · reported
CO₂ emitted22,637t2023 · reported to EPA · 5,305th highest of 6,030 in the US
Rank in California#842 (tied)of 1,713 · by capacity · #6,337 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor52%2023

Location

San Mateo County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 459,961 MMBtu · reported · $3.83M est.

CO₂ emitted, t · 2011–2023

010,00020,00030,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 6.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN16.0Natural GasNatural Gas Fired Combustion Turbine1987Operating

1 unit shown. Behind it, AEA holds the full engineering record: ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Sri International · 100%
Operating utility
IPT SRI Cogeneration Inc
Entity type
Commercial
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1012095
Balancing authority
CAISO
NERC region
WECC
Gas pipeline
Pacific Gas
EIA plant ID
50537

Common questions

How big is SRI International Cogeneration Project?
6.0 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Sri International (100%) and operated by IPT SRI Cogeneration Inc, filed as commercial.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1987.
When is it due to retire?
No retirement date has been filed for any operating unit at SRI International Cogeneration Project. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $3.83M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
22,637 t in 2023, reported to the EPA — the 5,305th highest of 6,030 US facilities that reported. Down from 26,992 t in 2011.

Related pages

California energyAll facilities in the state→Altamont Landfill & Resource Recovery Facility6.0 MW operating capacity→ CSU, San Jose State University6.0 MW operating capacity→ Avenal Park6.0 MW operating capacity→ Calipatria State Prison6.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming