AMERICAN ENERGY ATLAS
Industrial + power·California

Altamont Landfill & Resource Recovery Facility

Livermore, Alameda County, California · CAISO · operated by WM Renewable Energy LLC · owned by Waste Management Inc

2023 · headline year
Fuel spend$137,8732023 · estimate
Capacity in service6.0MW2 units · biomass
Net generation39.4GWh2023 · reported
CO₂ emitted203,454t2023 · reported to EPA · 1,507th highest of 6,030 in the US
Rank in California#842 (tied)of 1,713 · by capacity · #6,337 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor75%2023

Location

Alameda County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 725,865 MMBtu · reported

CO₂ emitted, t · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 6.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN13.0Landfill gasLandfill Gas1989Operating
Unit GEN23.0Landfill gasLandfill Gas1989Operating
Unit GEN31.3Landfill gasLandfill Gas2002Retired 2018
Unit GEN41.3Landfill gasLandfill Gas2002Retired 2018

All 4 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Waste Management Inc · 100%
Operating utility
WM Renewable Energy LLC
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1007699
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
50571

Common questions

How big is Altamont Landfill & Resource Recovery Facility?
6.0 MW across 2 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Waste Management Inc (100%) and operated by WM Renewable Energy LLC, filed as industrial.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1989. Every operating unit came online in 1989.
When is it due to retire?
No retirement date has been filed for any operating unit at Altamont Landfill & Resource Recovery Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.
How much does it spend on fuel?
An estimated $137,873 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
203,454 t in 2023, reported to the EPA — the 1,507th highest of 6,030 US facilities that reported. Down from 217,309 t in 2011.

Related pages

California energyAll facilities in the state→Genentech Vacaville Meter #16.1 MW operating capacity→ Oxbow (CA)6.1 MW operating capacity→ CSU, San Jose State University6.0 MW operating capacity→ SRI International Cogeneration Project6.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming