CSU, San Jose State University

San Jose, Santa Clara County, California · CAISO · operated by San Jose State University Fclts Dev &Ops · owned by State of California

2023 · headline year
Fuel spend$7M2023 · estimate
Capacity in service6.0MW1 unit · gas
Net generation26.2GWh2023 · reported
CO₂ emitted27,333t2023 · reported to EPA for the whole site, which is larger than the plant shown here · 4,954th highest of 6,030 in the US
Rank in California#842 (tied)of 1,713 · by capacity · #6,337 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor50%2023

Location

Santa Clara County · CAISO · WECC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 400,551 MMBtu · reported · $7M est.

CO₂ emitted, t · 2014–23

020,00040,00060,000201420182023
Reported (through 2023)

Generating units

1 of 1 shown · 6.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN16.0Natural GasNatural Gas Fired Combustion Turbine1984Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →
UnitEventWhenMW
Unit GEN1retirement2030-066.0 MW

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
State of California · 100%
Operating utility
San Jose State University Fclts Dev &Ops
Entity type
State-Owned Utility
Regulatory status
Not Regulated
Industry sector
Other
EPA facility ID
1011772
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
10548

Common questions

How big is CSU, San Jose State University?
6.0 MW across 1 generating unit in service.
Who owns and operates it?
Owned by State of California (100%) and operated by San Jose State University Fclts Dev &Ops, filed as state-owned utility.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1984.
When is it due to retire?
Planned retirement dates are filed for 1 of 1 operating units: Unit GEN1 (2030).
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas.
How much does it spend on fuel?
An estimated $7M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
27,333 t in 2023, reported to the EPA — the 4,954th highest of 6,030 US facilities that reported. Down from 30,317 t in 2014.

Also at this site

CSU San Jose State UniversitySame site · operating→ San Jose Convention CenterSame site · retired→ Adobe San JoseSame site · retired→

Related pages

California energyAll facilities in the state→Oxbow (CA)6.1 MW operating capacity→ Altamont Landfill & Resource Recovery Facility6.0 MW operating capacity→ SRI International Cogeneration Project6.0 MW operating capacity→ Avenal Park6.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming