Bridge City, Orange County, Texas · MISO · operated by Entergy Texas Inc. · owned by Entergy Corp
2023 · headline year
Reported fuel cost$125M2023 · reported deliveries
Capacity in service1,812MW4 units · gas
Net generation3.8TWh2023 · reported
CO₂ emitted2.14Mt2023 · reported to EPA · 278th highest of 6,030 in the US
Rank in Texas#7of 941 · by capacity · #95 of 13,147 US
Reported suppliers42023 · 44 deliveries
Capacity factor24%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 51.1 TBtu · reported
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
5 of 5 shown · 1,812 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 4
591.6
Natural Gas
Natural Gas Steam Turbine
1974
Operating
Unit 5
507.4
Natural Gas
Natural Gas Steam Turbine
1979
Operating
Unit 3
473.4
Natural Gas
Natural Gas Steam Turbine
1966
Operating
Unit 1
239.4
Natural Gas
Natural Gas Steam Turbine
1962
Operating
Unit 2
239.4
Natural Gas
Natural Gas Steam Turbine
1962
Retired 2016
All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.