Orange County, Texas · MISO · operated by Entergy Texas Inc.
Capacity shown is planned or not in service
A planned 1,306 MW natural gas fired combined cycle project, filed to come online in 2026.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit 1A | 453.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2026 | Proposed |
| Unit 1B | 453.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2026 | Proposed |
| Unit 1C | 400.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2026 | Proposed |
All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit 1A | new unit | 2026 | 453 MW |
| Unit 1B | new unit | 2026 | 453 MW |
| Unit 1C | new unit | 2026 | 400 MW |