Rausch Creek Generation LLC

Tremont, Schuylkill County, Pennsylvania · PJM · operated by Rausch Creek Generation, LLC · owned by Rausch Creek Electric Power Holdings LLC

2023 · headline year
Fuel spend$22.4M2023 · estimate
Capacity in service36.0MW1 unit · coal
Net generation156GWh2023 · reported
CO₂ emitted352,869t2023 · reported to EPA · 1,136th highest of 6,030 in the US
Rank in Pennsylvania#104 (tied)of 256 · by capacity · #3,874 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor50%2023

Location

Schuylkill County · PJM · RFC

CO₂ emitted, t · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 36.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN136.0Waste coalConventional Steam Coal1987Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Rausch Creek Generation, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1001249
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
50611

Common questions

How big is Rausch Creek Generation LLC?
36.0 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Rausch Creek Electric Power Holdings LLC (100%) and operated by Rausch Creek Generation, LLC, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1987.
When is it due to retire?
No retirement date has been filed for any operating unit at Rausch Creek Generation LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by waste coal.
How much does it spend on fuel?
An estimated $22.4M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
352,869 t in 2023, reported to the EPA — the 1,136th highest of 6,030 US facilities that reported. Up from 332,417 t in 2011.

Related pages

Pennsylvania energyAll facilities in the state→Lookout Windpower LLC37.8 MW operating capacity→ York County Resource Recovery36.5 MW operating capacity→ Titus36.0 MW operating capacity→ Lancaster Waste to Energy Facility35.7 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming