AMERICAN ENERGY ATLAS
Industrial + power·Pennsylvania

Lancaster Waste to Energy Facility

Bainbridge, Lancaster County, Pennsylvania · PJM · operated by Covanta Lancaster Inc · owned by Lancaster County Soild Waste Management Authority

2023 · headline year
Fuel spend$109M2023 · estimate
Capacity in service35.7MW1 unit · waste
Net generation187GWh2023 · reported
CO₂ emitted160,651t2023 · reported to EPA · 1,763rd highest of 6,030 in the US
Rank in Pennsylvania#106of 256 · by capacity · #3,888 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor60%2023

Location

Lancaster County · PJM · RFC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Other fuels · 4.06 TBtu · reported

CO₂ emitted, t · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 35.7 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN135.7Municipal solid wasteMunicipal Solid Waste1990Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; stack height; ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Covanta Lancaster Inc
Entity type
Municipally Owned Utility
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1007677
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
50859

Common questions

How big is Lancaster Waste to Energy Facility?
35.7 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Lancaster County Soild Waste Management Authority (100%) and operated by Covanta Lancaster Inc, filed as municipally owned utility.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1990.
When is it due to retire?
No retirement date has been filed for any operating unit at Lancaster Waste to Energy Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned other fuels.
How much does it spend on fuel?
An estimated $109M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
160,651 t in 2023, reported to the EPA — the 1,763rd highest of 6,030 US facilities that reported. Up from 151,957 t in 2011.

Related pages

Pennsylvania energyAll facilities in the state→Rausch Creek Generation LLC36.0 MW operating capacity→ Titus36.0 MW operating capacity→ Casselman Wind Power Project34.5 MW operating capacity→ Covanta Plymouth Renewable Energy LLC32.1 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming