York County Resource Recovery

York, York County, Pennsylvania · PJM · operated by York County Solid W & R Auth · owned by York County Solid Waste & Refuse Authority

2023 · headline year
Capacity in service36.5MW1 unit · waste
Net generation255GWh2023 · reported
CO₂ emitted171,810t2023 · reported to EPA · 1,678th highest of 6,030 in the US
Rank in Pennsylvania#103of 256 · by capacity · #3,866 of 13,147 US
Reported suppliersNot reported2023
Capacity factor80%2023

Location

York County · PJM · RFC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

99% Other fuels · 4.09 TBtu · reported1% Natural gas · 0.0485 TBtu · reported

Other fuels supplies 99% of the fuel energy its on-site power plant burned in 2023.

CO₂ emitted, t · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 36.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN136.5Municipal solid wasteMunicipal Solid Waste1989Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
York County Solid W & R Auth
Entity type
Political Subdivision
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1006647
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
50215

Common questions

How big is York County Resource Recovery?
36.5 MW across 1 generating unit in service.
Who owns and operates it?
Owned by York County Solid Waste & Refuse Authority (100%) and operated by York County Solid W & R Auth, filed as political subdivision.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1989.
When is it due to retire?
No retirement date has been filed for any operating unit at York County Resource Recovery. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned other fuels and natural gas.
How much CO₂ does it emit?
171,810 t in 2023, reported to the EPA — the 1,678th highest of 6,030 US facilities that reported. Up from 152,860 t in 2011.

Related pages

Pennsylvania energyAll facilities in the state→Chestnut Flats Wind Farm38.0 MW operating capacity→ Lookout Windpower LLC37.8 MW operating capacity→ Rausch Creek Generation LLC36.0 MW operating capacity→ Titus36.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming